LBJSC Third Floor Renovation
PHASE 01

DATES ROOMS WILL BE OFFLINE
11.25.24 - 3.31.25
- LBJ Ballroom
- Prep Kitchen
- 3rd Floor Bathrooms
PHASE 02

DATES ROOMS WILL BE OFFLINE
12.14.24 - 1.20.25
- 313
- 314
- 315
- 316
- 317
PHASE 03

DATES ROOMS WILL BE OFFLINE
1.30.25 - 3.16.25
- 321
- 322
- 323
- 324
- 325
- 326
PHASE 04

DATES ROOMS WILL BE OFFLINE
3.8.25 - 3.16.25
- 3rd Floor Hallway